ATT-TP-76300, AT&T Installation Requirements
ATT-TP 76300 and ATT-TP 76400: ERCNs, IRCNs, TRCNs and related information

Section Title
File
   Complete ATT-TP-76300
  PREFACE
  CHECKLIST OF CURRENT PAGES
  TABLE OF CONTENTS
Section A INTRODUCTION
Section B GENERAL INSTALLATION REQUIREMENTS
Section C INSTALLER SKILL LEVEL ASSESMENT
Section D NETWORK RELIABILITY AND METHOD OF PROCEDURE
Section E JOB DOCUMENTATION
(pdf)
Section F FIRE STOPPING
Section G FLOOR DRILLING
Section H BONDING AND GROUNDING
Section I IRONWORK
Section J CABLING
Section K WIRING AND CONNECTING
Section L EQUIPMENT DESIGNATIONS
Section M POWER
Section N ELECTROSTATIC DISCHARGE (ESD)
Section O FIBER OPTICS
Section P CABLE VAULT AND CABLE ENTRANCE FACILITY
Section Q EQUIPMENT REMOVAL AND CABLE MINING
Section R PRODUCT CHANGE NOTICES AND MISCELLANEOUS INSTALLATIONS
Section S MARKED DRAWING REQUIREMENTS
Section T SYNCHRONIZATION
Section U STANDBY ENGINE/ALTERNATOR SETS
Section V HAZARDOUS WASTE MANAGEMENT
Section W AT&T GIDC ENVIRONMENTS
Section Z OUTSIDE PLANT (OPS)

This page was last reformatted on July 3rd 2014