EQUIPMENT DESIGN AND TESTING REQUIREMENTS PAGE
(ATT-TP76200 (NEBS))

ATT-TP-76200 / ATT-TP-76450 ANNOUNCEMENTS

12/11/2019 - Issue 1 of the ATT-TP-76200 Addemdum A has been posted. The purpose of this Addendum is to provide equipment suppliers with requirements for the use of Lithium Energy Storage Systems (ESS) or Battery Systems in AC or DC Power Architectures to be purchased and installed in all AT&T Technical Spaces. The content of this addendum is anticipated to be incorporated in the next issue of the ATT-TP-76200, Section 7.

4/23/2018 - Issue 18 of the ATT-TP-76450 has been posted.

6/30/2016 - Issue 17 of the ATT-TP-76450 has been posted.

6/22/2016 - Issue 20 of the ATT-TP-76200 has been posted.

3/11/2016 - The first issue of the ATT-TP-76208 has been posted to detail the equipment physical design requirements for virtual OLT Equipment.

1/27/2016 - The first issue of the ATT-TP-76207 has been posted to detail the equipment physical design requirements for AIC Store and Compute Equipment.

The ATT-TP76200/ATT-TP76450 evaluation process has replaced evaluations for:
Legacy T (NEDS), Legacy B (TR 73638BT) and Legacy S (ATT-TP76200 Issue 10)


AT&T EQUIPMENT REQUIREMENTS TECHNICAL PUBLICATIONS
Document
Title
Issue/Posted
ATT-TP-76200 Network Equipment Power, Grounding,
Environmental, and Physical Design Requirements
Issue 20, 06/21/2016
ATT-TP-76200 Addendum A Lithium Energy Storage Systems (ESS) or Battery Systems in AC or DC Power Architectures Issue 1, 12/11/2019
ATT-TP-76450 Transport Process: Common Systems Standards Issue 18, 4/23/2018
ATT-TP-76201 Common Systems Hardware Products and Material Specifications Issue 7, 08/07/18
ATT-TP-76204 Project Lightspeed and DSL
Residential Equipment Safety Requirments
Issue 3, 09/12/08
ATT-TP-76205 AT&T ELECTRONIC EQUIPMENT ENCLOSURE / CABINET (EEE/C) STANDARD Issue 5, March 2016
ATT-TP-76208 Virtual Optical Line Termination Equipment Physical Design Requirements Issue 1, 3/9/16
ATT-TP-76406 Dynamic Switching Control of Lighting Fixtures Issue 6, 9/21/15
ATT BASIC SYNCHRONIZATION
Requirements (GR 1244)
2/28/05